You encounter them in every village, town, or region: bridges. There is no other country in the world that has as many bridges and footbridges per square kilometer as the Netherlands. Large cities like Rotterdam and Amsterdam each have at least a thousand examples, or so it is said. All these bridges are expected to function well and reliably, and, moreover, to be available and safe. It is not surprising that many a bridge also features in Delta Pi.
The bridges of Delta Pi
Since 2001, the people at Delta Pi have contributed to improving and safeguarding the performance of more than 100 bridges throughout the Netherlands. We were involved in the construction of the new Botlek Bridge in Rotterdam, as well as the renovation of the 800-meter-long Ketel Bridge on the A6 motorway: the bascule bridge that connects the Noordoostpolder and Eastern Flevoland. We are responsible for the future (RAMS) performance of the Van Brienenoord bridges, as well as the bridges of Rijkswaterstaat West-Nederland Zuid, including the Spijkenisser Bridge. And what about the iconic red bridge over the IJssel River on the Hanseatic railway line (where, despite effective risk and RAMS management, someone unexpectedly cycled over the arch on their cyclocross bike).

Analyzing business reliability
We're usually asked to apply our knowledge and expertise to individual bridges, but sometimes a project comes along that's a bit larger and more comprehensive. For example, Delta Pi consultants were asked to analyze the performance of thirty bridges in the province of South Holland. And what about our work on all movable and fixed bridges at the locks in the Netherlands? Clients rely on Delta Pi for such large-scale projects because we specialize in analyzing and quantifying the operational reliability of bridges, locks, tunnels, and movable flood defenses. We're often engaged by the client themselves, such as municipalities, provinces, or Rijkswaterstaat (the Directorate-General for Public Works and Water Management). However, contractors and other consultants are also increasingly finding their way to us. For example, a few years ago, in collaboration with TNO, we developed an approach to analyze and better manage teething problems in new and renovated bridges.
Personal favorites
When you're so often and so involved with bridges, a preference, or even a professional passion, for them naturally develops. For example, some colleagues are crazy about the Van Brienenoord Bridge. A beautiful bridge steeped in history. The bridge was built entirely on-site and was officially opened by Queen Juliana in 1965. After a few years, the bridge's capacity proved insufficient. Therefore, a project began in 1986 to double the size of the Van Brienenoord Bridge and its access roads. Delta Pi has been involved in the renovation of this historic bridge for several years since 2018.

For Joël Luyk, the New Botlek Bridge is a special project. "This bridge inextricably links rail, road, and shipping traffic, and that presents interesting challenges for a consultant like me."
And Ivan Reijnen’s favorite? “Well, that would have to be the Ketelbrug on the A6. Here, I got to conduct an extensive audit of the SE, RAMS, and machine safety processes. But now that I think about it: the RAMS analysis for the Calandspoorbrug was also a great assignment. Just like contributing ideas regarding the future performance of the Schipholbrug on the A9 motorway.”
Ah, actually, it is simply impossible to choose a favorite. After all, a mechanical engineer’s heart beats faster for every movable bridge.



